LOCATION
The dam site is to be located on Shyok River near Yugo village, 60 km from Skardu city. The powerhouse site is located just downstream of Dam.
SALIENT FEATURES
- Generation Capacity 520 MW
- Average Flow 365 m3/s
- Dam Height 165 m
- Storage 10.7 MAF
- Head Water Level 2590 m
- Tail Water Level 2440 m
- Length of Power Tunnel 1.0 km
- Gross Head 150 m
- Net Head 146 m
- Design Discharge 500 m3/s
Mean Annual Energy 2080 GWh Plant Factor 45.6%
PRESENT STATUS
• The project is identified by MECO under CIDA grant during 1984.• The capacity has been studied by HPO, WAPDA.Courtesy: